2020
The project requires the relocation of the main GST cable that is fixed to Mawson Lakes Drain Bridge due to the bridge’s existing infrastructure being demolished and replaced.
Omada were engaged to assist in the removal and reinstating of all the signalling infrastructure that uses the bridge for reticulation.